DISTRIBUTIE ENERGIE OLTENIA S.A.
Projects
- Release of site and/or achievement of the conditions of coexistence with the installations owned by DEO SA for the construction of the Bypass of Tg-Jiu municipality, Gorj county_SECOL ROMANIA SRL
- Establishing the conditions of coexistence for the “Craiova Bypass Belt – South Variant DN56 – DN 6” with respect to the electrical networks belonging to SC Distribuție Energie Oltenia SA in MV + JT installations
Establishing the conditions of coexistence for the “Craiova Bypass Belt – South Variant DN56 – DN 6” with respect to the electrical networks belonging to SC Distribuție Energie Oltenia SA in IT installations - Electrical energy supply parc photovoltaic SC Danube Solar Five SRL, com Pielesti, sat Pielesti, T84-P678, jud. Dolj-TR, PI=49700 kW
Strengthening of the network for electrical energy supply parc photovoltaic SC Danube Solar Five SRL, com Pielesti, sat Pielesti, T84-P678, jud. Dolj
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION
PROJECT
- Power supply of the Site Organisation
DISTRIBUTIE ENERGIE ELECTRICA ROAMNIA S.A.
PROJECTS
- Network reinforcement works, Brasov County – LOT 1
- Network reinforcement works, Brasov County – LOT 3
- Network reinforcement works, Brasov County – LOT 4
- Network reinforcement works, Brasov County – LOT 6
- Network reinforcement works, Brasov County – LOT 7
RETELE ELECTRICE MUNTENIA S.A.
PROJECT
- Site clearance/coexistence of the objective – Construction of a residential complex DS+GF+4F+5FR, commercial spaces on the ground floor, fencing, and utilities in Ilfov County, Popesti-Leordeni, Biruintei Street No. 7 – ANANDA RESIDENCE S.R.L.
RETELE ELECTRICE BANAT S.A.
PROJECTS
- Regulation of electrical installations in relation to the objective – Rehabilitation of tram lines and modernization of street trams, route 4, Timisoara
- Regulation of LEA 110 kV affected by the construction of the uneven passage on the Arad bypass belt (DN 7 km 540+248) over the CF Arad – Bucharest
- Modernization of LEA 110 kV Baru Mare – Lonea shared with LEA 110 kV Paroseni – Baru Mare, Aninoasa Nord circuit 1 (between stp. 1-77) and Baru Mare – Lonea shared with Aninoasa Nord – Petrosani CFR from the Aninoasa Nord derivation to the derivation Petrosani CFR (between stp. 78-113) and LEA 110 kV Baru Mare – Lonea shared with LEA 110 kV Lonea – Petrila from Petrila derivation (between stp. 114-143)
- Realization of optical fiber connections (OPGW, ADSS) on LEA 110kV managed by RE Banat
- Creation of optical fiber links (OPGW, ADSS) on LEA 110 kV managed by REB:
– Object 1 LEA 110kV Timisoara
– Object 2 LEA 110kV Gataia
ALSIM ALARKO SANAYI TESISLERI VE TICARET ANONIM SIRKETI ISTANBUL
PROJECT
- Utility diversions works of lighting networks at Tokio station, airport Baneasa station, gara Baneasa and shafts (Gara Baneasa – Airoport Baneasa)
- Power supply with electricity parking left, lighting, and ITS km 64+600
- Power supply Works in DN4 Ring, km 61+600, Bucharest Highway, A0
- The execution of electrical connections for TBMs and for the Site Organizations of 6 stations, Site Organization at 1 Mai structure gallery and 7 Site Organizations at CV SPAI and SPAI
- Power supply with electricity parking right, lighting, and ITS km 64+600
- Power supply with electricity PSI km 60+600
- Power supply with electricity parking right 55+900
- Power supply with electricity parking left 55+900
- Power supply with electricity Nod A2